Add duration_sec, task_class, zone_type, and surface for scheduling and cross-contamination linting
Lets a task declare its hands-on duration separate from chemical dwell time and tag its role in the sequence (floor, high_surface, ppe_change, disinfect, restock, safety_check, reset), and lets a zone declare its type and dominant surface — so a validator can catch a floor task ranked ahead of dusting, a missing PPE change between a restroom and a food-prep zone, or an acid cleaner run against marble, without guessing from label text.
Released in v2.5.0 · maintainer proposal
No comments yet — be the first.
draftRFC-026
◯ 0
Add role, crew_id, and gate fields for staffing architecture
Lets a zone or task declare a specialist role and crew grouping, and marks synchronization points where parallel crews must rejoin — so Zone, Crew, and Team Cleaning are plan shapes, not separate schemas.
Early draft · maintainer proposal
No comments yet — be the first.
draftRFC-027
◯ 0
Add area_sqft, fixture_count, and benchmark_rate for workloading
Lets a zone declare machine-readable area and fixture counts, and a task cite its production-rate benchmark, so ISSA/APPA labor-time formulas compute directly from the plan.
Early draft · maintainer proposal
No comments yet — be the first.
draftRFC-028
◯ 0
Add atp_reading and uv_marker proof types for quality verification
Extends photo proof with ATP bioluminescence readings and UV/fluorescent marker checks, plus a supervisor audit record, so a plan can prove it was cleaned for health, not just swept for appearance.
Early draft · maintainer proposal
No comments yet — be the first.
03 — From proposal to release
How a change becomes part of the spec.
Every change follows the same public path. Nothing skips a stage, and every decision is written down with its reason.
01Submitted≤ 3 daysModerator
Spam and duplicate check. Out-of-scope ideas are closed with a reason.
02Draft RFCOpen-endedAuthor + sponsor
A maintainer sponsors it, assigns an RFC number, and helps shape a concrete schema diff.
03Proposed14 daysPublic
Open comment period. Implementers flag cost, conflicts, and migration pain.
04Last call7 daysPublic
Final text is frozen. Only blocking objections are raised now.
05AcceptedVoteMaintainers
2 maintainer approvals and no unresolved blocking objection. Breaking changes need a ⅔ steering vote.
06ReleasedNext trainRelease editor
Merged into the next PATCH, MINOR, or MAJOR release with a changelog entry.
Other outcomesDeclined — with a written reason; can be reopened with new evidence.Withdrawn — by the author at any stage.Deferred — accepted in principle, parked for a future MAJOR.
04 — Versioning
The version number tells you what you have to do.
The spec follows semantic versioning. Choosing a change type in your proposal tells reviewers which release train it can ride.
MAJOR3.0.0
Breaking
Removes or renames a field, makes an optional field required, or changes what a valid plan means.
⅔ steering vote
Reference implementation + migration guide
Deprecated in the prior MINOR first
At most one per year · previous MAJOR supported 12 months
e.g. v2.0 — versioned task_idMINOR2.6.0
Additive
New optional fields, new enum values, new chapters. Every valid 2.5 plan stays valid.
2 maintainer approvals
Validator + examples updated
Quarterly release train
e.g. v2.5 — duration_sec + task_classPATCH2.5.1
Clarification
Wording, examples, typo fixes, and clarified rules that do not change what validates.
1 maintainer approval
Skips last call
Released as needed
e.g. clearer dwell-time wording
spec_versionWhich edition of this specification a plan conforms to. Changes through this process.
versionThe plan's own semver. Your team bumps it when the building's plan changes.
task_id + task.versionThe ID never changes; the task version increments on each edit so audits stay traceable.